Utente non Registrato

Discover

Dam

Robb. 9 - Jpg

This dam was built to feed the Edison canal which brought water to the Esterle power station a few kilometres lower down the valley. In order to exploit the drop in level above and below the dam, another power station was built, named after Guido Semenza, in the town of Calusco d’Adda (BG).

via Alzaia - Robbiate